Library-Brecon Trail under construction

Local News Needs Your Support

Donation Options

 10/23/2012 - 15:46

The Library-Brecon Pathway project started mid-October. The path is located along the south side of Brecon Park and north of the inactive railroad right of way. An earth grade has been established so that a 6” limestone base and then 10’ wide 2’ deep bituminous pavement can be placed on it. This non-motorized pathway will link Maple Road to Harris Street.