Bemis and Moon Road Roundabout Construction Begins Sept. 12

 09/06/2018 - 01:08

On Wednesday, Sept. 12, the Washtenaw County Road Commission (WCRC) and its contractor will close the intersection of Moon Road and Bemis Road to construct a roundabout.

While the roundabout is being built, the following work will also take place:

  • Resurfacing of Moon Road from Willis Road to Bemis Road
  • A permanent culvert will be installed on Bemis Roadbetween Fosdick Road and Warner Road, replacing the temporary culvert that was placed this past winter at this location. A separate road closure advisory will be issued for the culvert replacement.

While the work is ongoing, traffic will be permitted to drive on Moon Road North of Willis Road. However, traffic will not be able to drive through the Moon Road and Bemis Road intersection.

The road improvements are expected to be completed by late October. However, all dates are tentative and subject to change due to weather conditions and other circumstances.

The posted detour for Moon Road will be Willis Road to Platt Road to Michigan Avenue (U.S. 12). The posted detour route for Bemis Road will be Platt Road to Michigan Avenue (U.S. 12) to South Industrial Road.

Saline Post Staff's picture
The Saline Post
Sign up for The Saline Post, start posting and reach thousands of Salinians each day. It's free and you can start at www.thesalinepost.com/user/register

Follow the author on         or visit   Personal Blog