CITY OF SALINE: Industrial Drive Repaving Project Delayed For Testing

Local News Needs Your Support

Donation Options

 07/30/2019 - 15:17

The City of Saline announced on its Facebook page Tuesday that the Industrial Drive construction project "has been on a bit of a hiatus" as the city waits for material testing.

According to the city, the project design specified a stress-absorbing membrane interlayer between the layers of asphalt to extend the life of the pavement. This also requires testing.

Material from the project must be tested in a laboratory before it's installed.

The city expects the results today. Traffic will shift to the west side of the street after the next round of paving, but it will remain northbound, only.

Residents were encouraged to pay attention to signage denoting detours and turning and entrance restrictions.
 

Tran Longmoore's picture
Tran Longmoore
Tran Longmoore is a veteran community journalist. He is founder and owner of TheSalinePost.com. He is co-publisher of The Saline Post weekly newspaper. Email him at [email protected] or call him at 734-272-6294.

Follow the author on         or visit   Personal Blog