Image
Two technicians look up at NASA’s Nancy Grace Roman Space Telescope after its inner and outer segments were connected at the agency’s Goddard Space Flight Center in Greenbelt, Maryland on Nov. 25, 2025. This marked the end of Roman’s construction. After final testing, the telescope will move to the launch site at NASA’s Kennedy Space Center in Florida for launch preparations in summer 2026. Roman — named after Dr. Nancy Grace Roman, NASA’s first chief astronomer — is slated to launch by May 2027, but the team is on track for launch as early as fall 2026.
Off you go first thing into the world of more government control. Government run power systems shouldn't even be on your mind. DTE is a private company, government regulated. Even that is ripe for corruption. How is the government run water monopoly doing? Think of Flint, Michigan and even little Saline.
Apart of the book of Revelation. We are living in it
Patchy rain nearby, with a high of 62 and low of 47 degrees. Patchy rain nearby during the morning, overcast during the afternoon, partly cloudy during the evening, patchy rain nearby overnight.
To the editor ✍️
Please report out who said what accurately.
Is there something wrong with the current setup?
The fire department is receiving hundreds of thousands if not over a million in new equipment in conjunction with the data center project. Would think that save would have freed money at some point in the budget projections. More to the point, we have heard the Fire Chief speak two or three times now.